NASA fuels new moon rocket in week’s 2nd launch attempt

Cape Canaveral, September 3

NASA began fuelling its new moon rocket Saturday for liftoff on a test flight that must go well before astronauts climb aboard.

For the second time this week, the launch team began loading nearly 1 million gallons of fuel into the 322-foot rocket, the most powerful ever built by NASA.

Monday’s attempt was halted by a bad engine sensor and leaking fuel.

As the sun rose, an over-pressure alarm sounded and the tanking operation was briefly halted, but no damage occurred and the effort resumed, NASA’s Launch Control reported.

NASA wants to send the crew capsule atop the rocket around the moon, pushing it to the limit before astronauts get on the next flight.

If the five-week demo with test dummies succeeds, astronauts could fly around the moon in 2024 and land on it in 2025.

People last walked on the moon 50 years ago.

Forecasters expected generally favourable weather at Kennedy Space Center, especially toward the end of the two-hour afternoon launch window.

At the same time, the rocket’s lead engineers expressed confidence in the tightened-up fuel lines and procedure changes.

On Monday, a sensor indicated one of the four engines was too warm, but engineers later verified it actually was cold enough.

The launch team planned to ignore the faulty sensor this time around and rely on other instruments to ensure each main engine was properly chilled.

Before igniting, the main engines need to be as frigid as the liquid hydrogen fuel flowing into them at minus-420 degrees Fahrenheit.

If not, the resulting damage could lead to an abrupt engine shutdown and aborted flight.

Mission managers accepted the additional risk posed by the engine issue as well as a separate problem: cracks in the rocket’s insulating foam. But they acknowledged other problems could prompt yet another delay.

That didn’t stop thousands from jamming the coast to see the Space Launch System rocket soar.

Local authorities expected massive crowds because of the long Labour Day holiday weekend.

The $4.1 billion test flight is the first step in NASA’s Artemis program of renewed lunar exploration, named after the twin sister of Apollo in Greek mythology.

Twelve astronauts walked on the moon during NASA’s Apollo program, the last time in 1972.

Artemis — years behind schedule and billions over budget — aims to establish a sustained human presence on the moon, with crews eventually spending weeks at a time there. It’s considered a training ground for Mars.  

 

For all the latest Technology News Click Here 

 For the latest news and updates, follow us on Google News

Read original article here

Denial of responsibility! TechNewsBoy.com is an automatic aggregator around the global media. All the content are available free on Internet. We have just arranged it in one platform for educational purpose only. In each content, the hyperlink to the primary source is specified. All trademarks belong to their rightful owners, all materials to their authors. If you are the owner of the content and do not want us to publish your materials on our website, please contact us by email – [email protected]. The content will be deleted within 24 hours.